Measure A Bond Projects Updates, Reports, Information
Other Bond Projects - Fremont Campus
Update as of March 2007 Bond Report
(see Reports.)
Completed Improvement Projects
Disabled Access - Access ramps for Buildings 2, 4 & 6; additional ADA Access by replacing existing non-compliance doors and handles.
During installation of ADA ramp for Building 4.Science Labs - Created Biotechnology Laboratory in Buildling 8.
Classroom before conversion to Biotechnology Laboratory.
Classroom during conversion to Biotechnology Laboratory.
Classroom after conversion to Biotechnology Laboratory.Security / Safety Cameras - Install 32 cameras in parking lots and other high-traffic areas of the Fremont Campus.
After installation of security cameras, including screenshot views from security cameras.Exterior Lighting - Installation of approximately 50 pole lights walkways, down Olive Lane, and all pathways leading to parking areas.
After installation of exterior lighting near Olive Lane.Classroom / Lab Upgrade Phase A - Install media-enabled equipment, projectors, screens, podiums in 32 classrooms and labs.
After classroom upgrade.Gymnasium Floor - Replace tartan gym floor with new wooden floor, modify and upgrade bleachers.
Gym floor before, during, and after replacement. After installation of ADA door on gym entrance.Locker Room Upgrades - Remove and replace all old lockers in Men's and Women's Locker Rooms, remodel and upgrade restrooms, create two team rooms.
Before and after locker room upgrades.Weatherproof Buildings - Address urgent needs to repair damaged areas and remove mold.
Selected Bond Projects
- Install 12 ADA power-operated doors in Buildings 1, 5, 12, and 22
- Replace/repair weathered guardrails
- Replace deteriorating redwood stairs with pre-cast concrete stairs
- Replace exterior doors in 122 openings campus wide
Before replacement of guardrail and stairs.Exterior Facelift Building 1 - Exterior improvement to campus, paint campus buildings, repair stucco and exterior wood trim, improve frontage of campus, open stairwells (more daylight). Photo gallery: Fall 2006-Spring 2007 Building 1 stucco repair and new paint.
Tennis Courts - Resurface and repair weathered and cracking tennis courts.
Tennis courts before and after repair. Fremont Main Electric - Upgrade of main service capacity on the Fremont campus.
Erosion Control - Construct retaining walls, improve drainage, and install landscape to control erosion.
Active Improvement Projects
Digitize Campus Blueprints - Ongoing.
Water Intrusion (above grade) - Prevent water from entering building above grade by addressing roofing, caulking, and sealing needs.
During water instrusion work.Renovation of Vacated Space - Upgrade classrooms, labs, restrooms.
Lecture hall Room 3201 before and after renovation.Information Technology Infrastructure - Support critical technology infrastructure needs.
Documents
- Final Initial Study/Mitigated Negative Declaration for Water Intrusion Below Grade, Ohlone College Fremont campus, July 2008 (PDF) by Weiss Associates